For autumn 2027 programs made in Vietnam, the ten weeks before Tet shape more of the calendar than the months that come after. Tet falls on Saturday, February 6, 2027. Capacity confirmed and fabric ordered before factories close carries through the holiday. Programs that wait until after the restart begin their calendar in March.
This is for buyers who have already chosen Vietnam for autumn 2027 production. It covers where a program should stand in late November, why Tet sets the booking deadline, what a factory needs before it can hold a production slot, and what happens to the calendar when booking slips past the holiday. For the full holiday dates, fabric cut-offs, and restart timeline, see our guide to planning production around Tet.
The short version
Program review and pricing run through early December. Development and sampling follow from December into mid-January. Fabric orders and capacity confirmation need to land before the holiday so bulk production can start in April for a July or August delivery.
Where an Autumn 2027 Program Should Stand Now
Autumn 2027 goods that arrive at a US distribution center in late July or August leave the factory in June. Working backward from that ship date, each stage sets the timing for the one before it:
- Ocean transit to the US East Coast: four to five weeks.
- Final inspection, packing, and export: one to two weeks.
- Bulk production: four to eight weeks, starting in April.
- Fabric procurement: four to ten weeks plus the Tet closure, with orders placed in January.
- Development and sampling: three to six weeks, from December into mid-January.
- Program review and pricing: November into early December.
On that calendar, a buyer reading this in late November is on schedule if tech packs, quantities, and materials direction reach the production partner within the next two weeks. From a complete tech pack, scaled programs in Vietnam typically run 90 to 150 days to ex-factory. Autumn programs in heavier categories sit toward the longer end of that range, and the Tet closure sits on top of it.
Factories usually confirm capacity four to six months before the ship date. For a June ex-factory date, that window runs from late December through February, with the holiday in the middle. Our guide to seasonal production planning explains how factories allocate lines across the year.
Why Tet Sets the Booking Deadline
Vietnam has approved a seven-day public-sector Tet break from February 4 to 10, 2027. Private employers choose from three approved schedules for their five paid holiday days. At garment factories, the disruption runs well beyond the official dates.
Output slows before the holiday
Factories ease off in late January as workers travel home and buyers pull shipments into the last weeks before the break.
Chinese mills close at the same time
Chinese New Year falls on the same date. Many mills do not return to full operation until after the Lantern Festival on February 20.
The restart takes weeks
Factories reopen after the break, and full output usually returns in early March.
Confirmed programs restart first
Programs confirmed before the holiday resume with approved samples and fabric already on order. Programs booked after the restart start at program review.
A program booked before Tet works through the holiday. A program booked after it waits through the holiday and the restart.
Why Outerwear and Tailoring Book First
Each category carries a different lead time. Wool coats and tailored outerwear need some of the longest mill timelines in the wardrobe. Wool is sourced, spun, woven, and finished before anything is cut. Laminated and membrane-bonded fabrics need testing, seam sealing, and pressing capability that not every facility has, which narrows the lines that can take the work.
For brands developing coats from the winter 2027 coat trends, these are the programs to lock in before Tet. Insulated programs add fill sourcing and testing, covered in our guide to down and insulated outerwear manufacturing. Our guides to outerwear manufacturing and formal wear and tailoring manufacturing cover the requirements for each category. Stock-fabric knits and basics have more flexibility, since stock fabrics ship in weeks.
What a Factory Needs to Hold an Autumn 2027 Slot
A factory confirms capacity against a defined program. These are the details it needs before it can price the work and reserve line time:
Finalized tech packs
Full construction detail for every style. Reference photos cannot stand in for them.
Graded specifications
Measurements graded across every size in the range.
Materials direction
Approved fabrics and trims, or clear sourcing criteria for each.
Quantities by style and color
Target units for each style and colorway.
Delivery date and destination
The in-market date and the receiving port or distribution center.
Program type and compliance
A one-time order or an ongoing program, and any required social audits such as WRAP or SMETA.
Our guide to production-ready tech packs lays out what a complete package contains. Design teams still settling fabrics, trims, and construction can work through the decisions in designing apparel for production before review. Each change after the first sample usually means another sample round.
What Happens When Booking Spills Past Tet
A program that reaches a factory after the holiday follows a different calendar. Each later stage shifts with the start date, so the months between December and the March restart pass straight through to the landing date.
Booked before Tet
Program reviewed and priced in November and December. Samples approved and fabric ordered in January. Bulk production starts in April against confirmed line time.
Booked after the restart
Program review begins in late February or March, while factories are still returning to full output. Custom fabric orders wait for sample approval, and bulk production starts when line time opens behind programs already confirmed.
Fabric is usually the stage that holds the calendar. Custom-dyed, custom-knitted, and technical fabrics can take two months or more from order to mill delivery, and custom mill dates rarely move once the order is placed. Fabric still in China after mid-January will not arrive before March.
Where a late program can recover time
- One revision round per sample. Each extra round adds one to two weeks, so consolidated buyer feedback shortens development.
- Stock fabrics where the design allows. Stock fabrics ship in weeks rather than months.
- Capacity reserved early enough to add lines or shifts. Bulk production only compresses when line time is booked in advance.
- Air freight for priority styles. It recovers two to four weeks of ocean transit, at significant cost.
Using the Weeks Between Now and Tet
- Late November to early December: send tech packs, graded specifications, materials direction, and quantities by style and color for review and pricing. US Thanksgiving and year-end holidays shorten these weeks on the buyer side.
- December: begin development and sampling, with comments consolidated into one revision round per sample. Our guide to the sample development process covers each stage.
- Late December to January: approve samples, place fabric orders, and confirm capacity in writing before the holiday.
- Before the break: agree the restart date, the full-capacity date, freight bookings, and holiday contacts on both sides, and set inspection dates using our guide to quality control and inspection.
The Autumn 2027 Production Calendar
Our calendar works backward from an August 2027 landing, with every stage from program review to ocean transit mapped against Tet. Get the Autumn 2027 Production Calendar.
Where Pham Fashion House Fits
Pham Fashion House manages apparel production in Vietnam for brands, uniform programs, and institutional buyers. For autumn 2027, we review tech packs and quantities, build each program’s calendar against current factory capacity and the Tet closure, and confirm fabric and line time before the holiday.
Our programs typically start at around 3,000 units per style, for buyers with finalized tech packs and clear quantity targets.
Autumn 2027 production
Booking an autumn 2027 program?
Send your tech packs, quantities by style and color, and target delivery date. We will review the program and map its calendar to the Tet closure before factories break for the holiday.
Start a ConversationNeed the holiday dates first? Read our guide to planning production around Tet.