Production planning guide | AW 27/28
The Autumn 2027 Production Calendar
The autumn/winter 2027 palette was set in Paris in September. This four-page calendar maps the decisions between that palette and finished goods at a distribution center, and shows which of them belong to the next few months.
Inside the calendar
- A backward timelineEvery stage from tech pack review to landing, mapped for an August 2027 delivery.
- Lead times by stageTypical durations, what drives each one, and which stages can compress.
- Tet 2027 planningWhy the February shutdown runs longer than the holiday dates, and what to commit before it begins.
- A readiness checklistThe eight items a factory needs before it can quote accurately.
Get the calendar
Enter your details below. The download link appears as soon as the form is submitted.
We use these details to send the calendar and to follow up about production planning. See our Privacy Policy.